Welcome to city of tshwane 012 358 9999 customercare@tshwane.gov.za. home about tshwane most of tshwane's electricity comes from eskom, under licence for the area. load shedding schedules 2018.. City of tshwane @citytshwane welcome to the city of tshwane, an african city of excellence, the seat of south african government and the capital city of the rainbow nation.. Eskom indicated that it is planning changes to the current load shedding programme. these changes include the standardisation of schedules in relation to stages and load shedding times. this new requirements will have to be incorporated in a new schedule for tshwane. residents should please note that the revised schedule is an interim measure..
I regularly check the loadshedding scedule,but this afternoon,suddenly i need a username and password to enter? anybody else encounter this? very annoying,would like to know if the times haves. The load shedding started from 17:00 until 20:00. the power provider said it required a capacity saving of 600 megawatts. this is as a result of eskom not being able to generate the required capacity due to industrial action that affected them. tshwane metro published the following load shedding schedule: tshwane is on standby for stage 2 load.